Skip to content
Research Article Open access CC BY 4.0

Managing of Change Orders in Public Construction Projects: A Framework for Governmental Projects in Jordan

Waseem Al-Adwan, Moawiah Alnsour, Zakaria Al-Omari

Journal of Economics, Management and Trade · pp. 36–53 · Published 27 May 2022

10.9734/jemt/2022/v28i530411

Abstract

Change orders have a substantial impact on construction projects. In the Change orders, there is no "optimal solution", but we are always trying to get as close to the "optimality" as possible. This research aims to bridge this knowledge gap, by presenting a comparative study between Jordanian legislation and legislation in neighboring countries, in addition to determining the effect of change orders in a sample of previous projects on time and cost, in addition to identifying the reasons that led to these changes. Interview questions for experts in this field that include most of the parties related to changes to amend the current framework and submit a proposal to amend the systems for changes. This research studied the variation orders and their impact on the basic elements of projects, especially government projects, as well studied the legislative systems that rule variation orders and the most important differences between them and their conflict with each other. In the results, developing a framework for managing change orders was made. This framework can contribute to avoiding changes or how solving them or reducing their effects in the field of construction.

Variation orders legislation framework Jordan

Cited by 7

Institutional gatekeeping and change order prevention in public infrastructure projects: evidence from a governance reform in Jordan

Mohammed A. K. A. Al-Btoush, H. Almashaqbeh, T. Rawashdeh · Frontiers in Built Environment · 2026

Complexity measurement framework for change orders in construction projects: case study of Vietnam

V. Nguyen, Vachara Peansupap, Tanit Tongthong · Journal of Engineering, Design and Technology · 2025

Impact of Change Orders on Cost Overruns and Delays in Large-Scale Construction Projects

J. Ramadhan, M. Waty · Engineering, Technology & Applied Science Research · 2025

Showing 4 of 7 known citations — external sources report more than can currently be individually listed.

Article metrics

Real usage data collected on this platform.

14

Page views

0

PDF downloads

1

Outbound clicks

7

Citations

Views over time

Views by country

Approximate, from request IP at view time — not citizenship or institution. Countries with fewer than 5 views are grouped as "Other".

Traffic sources

Referring site, by host.

Views and downloads exclude known bots/crawlers. Citations combines this platform's own DOI-resolved index with each external source's own reported total — see Cited by above for individually listed citing works. Last refreshed 0 seconds ago.